Grinders/Mixers
Pipeline Delumper®
Inline Processor
Taskmaster®
Inline Grinder
PCM™
Pipeline Mixer
Super Shredder®
Inline
Disintegrator
Spiralift® SL
In-Channel
Fine Screen
Crushers/Mills
Delumper® L
Series Roll
Crusher
Delumper® LP
Low Friction
Crusher
Delumper® DC1200
Compact Twin-Shaft
Crusher
Delumper® Twin LP
Twin Shaft
Crusher
Delumper® HM
Severe Duty
Crusher
Delumper® S4
Ultra-Sanitary
Crusher
Definer®
Versatile
Sanitary Mill
Supreme™ Roll
Mills
Dual Roll Fine Mills
Bag Dump Stations
Granulators
Vulcanator®
Rubber Bale
Granulator
Grinders/Comminutors
Taskmaster®
TM8500
Grinder
Taskmaster®
Inline Grinder
Taskmaster®
TM14000
(Titan)
Taskmaster®
TM1600
Grinder/Shredder
Dimminutor®
Open Channel
Comminutor
Super Shredder®
Inline Disintegrator
Screening & Screening Systems
Spiralift® SL
In-Channel
Fine Screen
Spiralift® SLX
Heavy Duty
Screen
Spiralift® SC
Screenings
Washer-Compacter
Spiralift® SR
Septage Receiving
System
Screenmaster® ST
Fine Screen
Screenmaster CS ®
Bar Screen
Industrial Shredders
Taskmaster®
TM8500
5 HP
Taskmaster®
TM14000
5 HP
Taskmaster®
TM1600
Up to 20 HP
Taskmaster®
TM2300
Up to 50 HP
Taskmaster®
TM2800/TM3200
Up to 200 HP
Document Shredders
Taskmaster®
DS
Document Shredder
Taskmaster®
TM85DS
Document Shredder
MS10™
Mobile Document
Shredding Truck
FMI Systems
FMI System
Document Shredder
![]() |
The Borough of Shickshinny Sewer Plant faced a major operational problem. The plant, which has been in operation since 1979, services mostly residential areas, parts of two boroughs and a neighboring prison. It uses an activated sludge, secondary treatment process to process 500 MGD. Even though Shickshinny's plant had a grinder located in front of the pumps, their pumps were still jamming frequently. The great deal of time and effort being expended to regularly maintain the pumps was becoming an unacceptable burden. The plant also had a comminutor. According to the plant supervisor, "it was an old type comminutor and wasn't very effective. It just didn't do the job". In spite of all this equipment it was still necessary to regularly rake solids from a manual bar screen. That's when the plant personnel turned to their consulting engineer for advice. The engineer focused his attention on the operation of the grinder. It turned out this unit just wasn't strong enough to effectively handle the load and prevent overtaxing of the pumps. A new grinder was decided upon. The new unit, a Taskmaster®, was designed for heavier duty service than their previous grinder. The Taskmaster employs counter-rotating banks of intermeshing cutters to intensively reduce waste solids. Just as the time came to start up the new unit, the situation at the plant became critical. Only 15 minutes before the planned startup, the second of two pumps began to threaten to shut down. Since one pump was already out of operation, another failure would have caused serious trouble and the plant personnel were feeling the pressure. That's when the service engineer from Franklin Miller Inc. arrived. He was informed that the successful operation of the new unit was critical. After going through the necessary start-up procedures and inspecting the installation, the new grinder was energized. The results were immediate. To everyone's relief the unit lived up to its reputation and was truly impressive. The pump problems simply disappeared and manual bar screen raking was discontinued. According to plant operator, Mark Gensal, "The unit performed perfectly. It has been great. It relieved 95% of our problem, as far as pumps jamming up." He further commented "I really recommend it to anybody. It is very well constructed, hardly any maintenance. It is fantastic." |